<?xml version="1.0" encoding="utf-8" ?>








































































  <rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom">
    <channel>
      <title>Comments On: Fill &apos;Er Up
    
      by Darwin Bond-Graham</title>
      <link>http://www.bohemian.com/northbay/fill-er-up/Content?oid=2212134</link>
      <atom:link href="http://www.bohemian.com/northbay/Rss.xml?oid=2212134&amp;id=comments" rel="self" type="application/rss+xml" />      <description>Comments On: Fill &apos;Er Up
    
      by Darwin Bond-Graham</description>
      <language>en-us</language>
      <copyright>Copyright 2013 North Bay Bohemian. All rights reserved. This RSS file is offered to individuals, North Bay Bohemian readers, and non-commercial organizations only. Any commercial websites wishing to use this RSS file, please contact North Bay Bohemian.</copyright>
      <webMaster>editor@bohemian.com (North Bay Bohemian Webmaster)</webMaster>
      <pubDate>Thu, 23 May 2013 00:00:01 -0700</pubDate>
      <lastBuildDate>Thu, 23 May 2013 09:00:00 -0700</lastBuildDate>
      <generator>Foundation</generator>
      <docs>http://blogs.law.harvard.edu/tech/rss</docs>
      
        
          <item>
    
    <title><![CDATA[Re: Fill 'Er Up]]></title>

    
    <link><![CDATA[http://www.bohemian.com/northbay/fill-er-up/Content?oid=2212134&show=comments#2215839]]></link>

    <guid isPermaLink="true"><![CDATA[http://www.bohemian.com/northbay/fill-er-up/Content?oid=2212134&show=comments#2215839]]></guid>
    <author><![CDATA[Darwin BondGraham]]></author>
    <description>
      
      <![CDATA[Hi Linda,<br>
<br>
According to the County BZA, which is relying on hydrology studies done by independent consultants hired by Berg;<br>
<br>
"Potential offsite flood impacts of the project have been analyzed, and no significant impacts from the project related to a FEMA 100 year storm event on the bay flood plain will occur. For sub 100 year FEMA level storm events along the Petaluma River, where  water should not overtop the existing levee system protecting the property, there will also be no significant offsite flood impacts from the project" (from UPE08-0110: BZA Resolution Denying first Sierra Club Appeal, dated July 28, 2011.)<br>
<br>
The project was given an "exception to the grading ordinance for fill in the Special Flood Hazard Area" by the County.<br>
<br>
Part of the logic behind this exception is that things are being measured against a FEMA 100 year storm event.
        
        <br />
        Posted by 
        
          <a href="http://www.bohemian.com/northbay/Profile?oid=2215838">Darwin BondGraham</a>]]>
    </description>
    <pubDate>Fri, 30 Dec 2011 12:23:21 -0800</pubDate>
    <source url="http://www.bohemian.com">North Bay Bohemian</source>
  </item>
        
          <item>
    
    <title><![CDATA[Re: Fill 'Er Up]]></title>

    
    <link><![CDATA[http://www.bohemian.com/northbay/fill-er-up/Content?oid=2212134&show=comments#2215430]]></link>

    <guid isPermaLink="true"><![CDATA[http://www.bohemian.com/northbay/fill-er-up/Content?oid=2212134&show=comments#2215430]]></guid>
    <author><![CDATA[Linda Speel]]></author>
    <description>
      
      <![CDATA[What effect would this project have on Petaluma's flood plain?
        
        <br />
        Posted by 
        
          Linda Speel]]>
    </description>
    <pubDate>Fri, 30 Dec 2011 10:26:50 -0800</pubDate>
    <source url="http://www.bohemian.com">North Bay Bohemian</source>
  </item>
        
      
    </channel>
  </rss>



